Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Weir Work – Jasch Engineering Pvt Ltd
  • +91-22-3533 2735
  • jasch@jascheng.com

Tarapur Indl. Area….
Construction of New Weir Across River Surya.

Capacity : 2.85 MCM

Construction of New Weir across river Ulhas Near Jambhul Water Works.


Capacity :
Length of Weir – 195 RMT
Height of Weir – 7.35 M

Patalganga Indl. Area…
Augmentation of existing water supply scheme by construction of new circular RCC Jackwell at Patalganga.

Capacity : 8.56 MCM

Construction of K.T. Weir on Godawari River near Village Khedle-zunge, Tal. Niphad, Dist. Nashik.

Capacity : 1.08 MCM

Nivali Water supply scheme..Construction of K. T. weir at Nivali on Bav River.


Capacity :
4.58 MCM

Patalganga Indl. Area…
Augmentation of existing water supply scheme by construction of new circular RCC Jackwell at Patalganga.

Capacity :
8.56 MCM

WEIR WORK AT PATALGANGA, MAHARASHTRA
COLGROUT MSONRY WEIR ACROSS RIVER ULHAS NEAR JAMBHUL WATER WORKS, MAHARASHTRA