Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6170 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6170 Infrastructural Works Involving Water Supply & Road Works – Jasch Engineering Pvt Ltd Notice: WP_Theme_JSON_Resolver::get_user_data(): Error when decoding a theme.json schema for user data. Syntax error in /home/jascheng/public_html/wp-includes/functions.php on line 6170
  • +91-22-3533 2735
  • jasch@jascheng.com

Providing Infrastructural Facilities to MIDC Chakan Industrial Area, Phase – I

Capacity : Road Works including Asphalting, C.D. Works, Storm Water Drains, Streetlights, Agriculture etc.

Barvi Water Supply Scheme…Widening of Existing Service Road along Barvi Gravity Main and providing initial asphaltic treatment over widened portion (Bal.) & construction of additional service Road.

Capacity : Asphalt Road, Length – 14 Km.

Pune Infotech Park Ph – II. Construction of approach road.

Capacity : Asphalt Road

Deposit Work…., Up-gradation of infrastructure facilities in SEEPZ-SEZ – Strengthening of internal roads and providing RCC pipe cable ducts and RCC build up gutters.

Capacity : Asphalt Road, Length – 4.5 Km.

Taloja Water Supply Scheme…Strengthening & Improving Taloja Feeder Service Road

Capacity : Cement Concrete Road Length – 9.85 Km.

Taloja Industrial Area… Strengthening and resurfacing of roads in chemical zone.

Capacity : Asphalt Road

Dombivli Indl. Area.. Up gradation of the infrastructure Provided by MIDC in Dombivli Indl. Area.

Capacity : Cement Concrete Road Length – 20 Km.

Deposit Contribution Work – Improvement of existing Custom Check road and internal roads in SEEPZ-SEX premises. Providing 75 mm BM & 40 mm AC, Construction of footpath with paver blocks, construction of roadside RCC gutters and cable ducts.

Capacity : Asphalt Road, Length – 1 Km.

TTC Indl. Area… Providing Infrastructural facility at Airoli Knowledge Park such as Construction of balance two lane asphalt road and bus bay lanes alongwith central verge, RCC gutter cum Pathways.

Capacity : Asphalt Road, Length – 1.7 Km.

D.C. Work – Providing 75 mm. thick semi grouting & 75 mm. thick BM with 40 mm. thick AC treatment to custom check road and other internal road in Seepz premises.

Capacity : C.C. Lining

ROAD OVER BRIDGE AT TALOJA, MAHARASHTRA
TALOJA FEEDER SERVICE ROAD
C.C.ROAD IN DOMBIVLI
INDUSTRIAL AREA
CHAKAN INDUSTRIAL AREA….. INFRASTRUCTURAL FACILITIES – FOR M.I.D.C. PUNE
Notice: WP_Theme_JSON_Resolver::get_user_data(): Error when decoding a theme.json schema for user data. Syntax error in /home/jascheng/public_html/wp-includes/functions.php on line 6170 Notice: WP_Theme_JSON_Resolver::get_user_data(): Error when decoding a theme.json schema for user data. Syntax error in /home/jascheng/public_html/wp-includes/functions.php on line 6170