Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Bridge Work (R.O.B.) – Jasch Engineering Pvt Ltd
  • +91-22-3533 2735
  • jasch@jascheng.com

Taloja Industrial Area…. Construction of Road Over Bridge at level crossing gate No. 12A @ Km. 60/4-5 on Diva – Panvel Railway Line. Phase – I

Capacity : Length of Bridge 530 m. Width of Bridge 13.85 m.

ROAD OVER BRIDGE AT TALOJA, MAHARASHTRA