Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 H.S.R. & G.S.R. & E.S.R. – Jasch Engineering Pvt Ltd
  • +91-22-3533 2735
  • jasch@jascheng.com

Expansion of Barvi Water Works; Jambhul. Construction of HSR stage-III of 22,500 cum. Capacity of Jambhul.

Capacity : 22,500 M3

Construction of E.S.R. stage 2.5 of 2 lakhs liters capacity of Chondhe Tal. Shahapur, Thane.


Capacity : 2 Lakhs liters

Construction of Intake Structure on Amba River consisting of Intake Channel and Raw Water Pump House & R.C.C. shaft of 1000 m3 capacity having a height of 35 mtrs. above ground.

Capacity : 240 MLD

Providing and laying 1000 mm dia, 1500 mm dia M.S. Pipeline as rising/gravity main from MBR in sector 30 at Kharghar, Navi Mumbai

Capacity : 1000 mm dia Pipeline 4.667 KM and 1500 mm dia pipeline 0.708 KM

OUT SIDE VIEW OF WATER TREATMENT PLANT – PHASE III AT JAMBHUL, MAHARASHTRA
M. S. PIPELINE OF 800 MM DIA. FROM KALAMBOLI TO NERUL FOR CIDCO
INSIDE VIEW OF FILTER HOUSE OF WATER TREATMENT PLANT – PHASE III AT JAMBHUL, MAHARASHTRA