Expansion of Barvi Water Works; Jambhul. Construction of HSR stage-III of 22,500 cum. Capacity of Jambhul.
Capacity : 22,500 M3
Construction of E.S.R. stage 2.5 of 2 lakhs liters capacity of Chondhe Tal. Shahapur, Thane.
Capacity : 2 Lakhs liters
Construction of Intake Structure on Amba River consisting of Intake Channel and Raw Water Pump House & R.C.C. shaft of 1000 m3 capacity having a height of 35 mtrs. above ground.
Capacity : 240 MLD
Providing and laying 1000 mm dia, 1500 mm dia M.S. Pipeline as rising/gravity main from MBR in sector 30 at Kharghar, Navi Mumbai
Capacity : 1000 mm dia Pipeline 4.667 KM and 1500 mm dia pipeline 0.708 KM

