Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Tunnel Works – Jasch Engineering Pvt Ltd
  • +91-22-3533 2735
  • jasch@jascheng.com
  1. Inter Adit tunnel to pressure shaft.
  2. Ventilation tunnel.
  3. Tail Race channel.
  4. Part of underground power house cavern.
  5. Part length of Tail Race tunnel and pressure shaft.
  6. Transformer hall.
  7. Machine hall.
  8. Lower Adit tunnel to pressure shaft.

Capacity : Total length executed 2.5 Km and dia. of tunnel upto 8.10 m.

Dhom Balkawadi Project – Right Bank Canal Tunnel No. 5.
(Note : A record progress of 175.25 m tunnel excavation has been done.)

Capacity : 1.26 K.m.

CONSTRUCTION OF TUNNELS FOR GHATGHAR HYDRO ELECTRIC PROJECT AT SHAHAPUR, MAHARASHTRA