Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sina-ext domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jascheng/public_html/wp-includes/functions.php on line 6131 Dam Works – Jasch Engineering Pvt Ltd
  • +91-22-3533 2735
  • jasch@jascheng.com

Construction of Drainage arrangement Dam side cut off trench and filling of Main Dam from R.D. 180 to 780 mtr. of Chargad River Project.

Capacity : Maximum depth of C.O.T. was 18 m from I.T.’s Average ground level.

Construction of Earthen Dam at R.D. 240 to 780 mtr. for Main Dam and excavation of Waste Weir from R.D. 82 to 210 mtr of Chargad River Project.

Capacity : Height of dam was about 21 m. from average ground level.

Construction of Ogee Spillway from R.D. 82 to R.D. 120 and earth work from R.D. 780 to 960 of Chargad River Project & Earthwork.

Capacity : Dam is capable to storage 12.00 mm3 water on its upstream side.

Construction of Bageri Ka Naka Storage Reservoir Tehsil – Nathdwara, Rajasthan.

Capacity : Masonry Concrete Dam

Construction of M.I. Tank @ Balthan section (upto R.L. 93.80m.) Ch. No. 9.40 m. to 65 & 90 m. to 138 m. @ left & Right Key walls).

Capacity : Rubble Masonry Dam.

Dagadparwa M.I. Tank
Construction of Earthen Dam from R.D. 1800 to 3490m Spillway Tail Channel Excavation & allied works & Head Regulator at R.D. 1935m and R.D. 3350m

Capacity : Earthen Dam

Construction of additional gated spillway including supply & Erection of vertical lift gates and rehabilitation of Existing earthen dam, wing wall, masonry, non overflow and overflow of Nandsamand Dam.


Capacity : Earthen Dam

Construction of Earthwork of Dam, Waste Weir, Spill approach & Tail Channel, falls and head regulator of Pimpalgaon Tank Project including obtaining forest clearance from Central Government.

Capacity : Earthen Dam

Providing and laying 1000 mm dia M. S. Pipeline as raising gravity Mains from MBR in Sector – 26, Navi Mumbai.

Capacity : 2415.71

Providing, Laying, Jointing, Testing, Commissioning of 2500 Dia. Mild Steel Raw Water Rising Main From Hingne Culvert Ch:9630m To WTP at Parvati Ch:11700m Including All Items Followed by 5 Years Operation and Maintenance of The Work

Capacity : 2.2 Km.

Construction of Diversion Channel from Latiya Nallah to Surwal Dam including raising of Dam, Construction of Head and Cross Regulator in Tehsil & District Sawai Madhopur.

Capacity : Dam Embankment & Diversion Channel
Length 4 K.M.

Rehabilitation of earthen dam of Morel Irrigation Project, Dausa.

Capacity : Dam Protection length 5 KM

Construction of main Dam of Rajgarh Medium Irrigation Project (Earthen Dam, Over flow (Spillway) Wing Wall, head outlet sluice, Grouting work & Radial gate on Engineering procurement & construction (EPC) single responsibility Turn Key basis in Pachpahar Tehsil of Jhalawar Dist.

Capacity : Earthen Dam

CONSTRUCTION OF EARTHEN DAM & OGEE SPILLWAY AT AMRAVATI
CONSTRUCTION OF DAGAD PARWA DAM FOR WATER RESOURCES DEPT., AKOLA, MAHARASHTRA